Features of Project


Sr. No. Particulars Unit Details
1 Length Km 80.35 Km
2 Row Existing ROW (M) Proposed ROW (M)
47600 75958 10 10
75958 130128 12 12
3 Pavement Type Intermediate Lane (Km) Two Lane (Km)
Reconstruction 11.400 1.500
Widening 23.200 37.865
Overlay Section 1.800 2.965
Rigid Pavement 1.620
Total Length (KM) 80.350
4 Major Bridges
4.1 Reconstruction 1 Nos
4.2 Widening /Repair 1 Nos
5 Minor Bridges
5.1 New Construction / Re-Construction 12 Nos
5.2 Widening /Repair 0 Nos
6 Slab Culvert
6.1 New Construction / Re-Construction 9 Nos
8 Pipe culverts
8.1 New Construction/ Reconstruction 178 Nos
8.3 Widening 62 Nos
8.4 Retained Nos
9 Junctions Improvement
9.1 Major junctions 16 Nos
9.2 Minor Junction 25 Nos
10 Bus Shelter 13 Nos
11 Covered RCC drain 3120 Rmt
12 Retaining wall 2820 Rmt